Buildings and Facilities Task Force
Tuesday, September 8, 2026 - 9:00 am
Chris Clark - Chairman
Supervisor Clark called this task force to
order at 9:00 am with the following in attendance: Chris Clark, Mary Lamphear,
Tracie McGill, Clayton Menser, Cathy Reusser, Matt Stanley, Davina Thurston, Meg
Wood, Ike Tyler, Mike Mascarenas and Jim Dougan.
Also present: Dina Garvey and Andrew
Stanley.
CLARK: We will call this meeting to
order.
STANLEY, ANDREW: I am going to go
through the facilities. Obviously, we have a lot going on out here.
TYLER: That is looking nice.
STANLEY, ANDREW: Yeah, they’re coming
together. They’re about 75% complete, maybe a little more. They will be about 100%
complete by the end of the week. They have just a little touch up, clean up
stuff on Monday, but they’re looking like they’re going to be out of there,
everything graded and ready for us to pave, hopefully this week.
MASCARENAS: Yeah, Andrew, when you say
complete, can you tell them what the project is? Because that’s phase of it,
but it’s not going to be a 100% complete in terms of the entire project, but
this section of it.
STANLEY, ANDREW: So, this particular
phase, right here is the parking, paver bricks and sidewalks on that rear part
of the building. Just kind of clean it up so we can utilize that space instead
of it being like it was. So, what’s just this portion, we have a few other
portions associated with this building. We have the roof structure over the
back, which is over that pad that’s connected to the rear end of the building
and a few other spaces inside that are going to get updated.
MASCARENAS: And the blacktop.
STANLEY, ANDREW: Yup, blacktop.
MASCARENAS: We’re doing it.
STANLEY, ANDREW: So, once the concrete
is done, they’ll fine grade the gray area for asphalt. Once that’s complete,
DPW will do the paving. We’re hoping that it’s done by the 14th.
And then once that’s all completed,
we’ll get Con Tech done on that roof structure. Materials have been advertised;
the bids are due the 15th and once we have the materials here then
we’ll get them onsite. I don’t think it should take more than probably a couple
of weeks for them to complete that. It should be pretty quick.
So, it’s all moving pretty quick now,
hopefully we’re all together by snow.
The good news with that though, even the
weather hits us early, Con Tech is just in Peru, so all the concrete work is
done, this type of work can be piecemealed together, weather depending.
DOUGAN: Con Tech is making it
waterproof, so they’re building the structure and putting the roof materials on
it and tying back into the brick with flashing, but the lights underneath and
the pine ceiling underneath is all going to be done by Buildings and Grounds,
once it’s watertight.
STANLEY, ANDREW: So, first and second
floor remodel, demolition of both flooring and select walls has been completed
in both areas. Right now, we’re just working with the scheduling Con Tech. They
have a job in Peru, they are from outside the area, they’re like the Massena
area, so trying to get some schedules pushed together on all these projects so
that way they don’t have to come back down 10x, they can kind of setup and go
after it all in one shot.
DOUGAN: The flooring for both of those
areas is awarded, and the materials are on order. Most of our building
materials we’re providing and like sheetrock and the majority of the studs and
things are already here. We still have to buy the finished carpentry for the
upstairs, the doors, the trim and the countertop that goes up there, but most
of the raw materials are already here waiting for the contractor.
STANLEY, ANDREW: A few other
miscellaneous projects; Transportation Facility, we’re waiting for a proposal
from MJ Engineering on the design of that facility. Once we receive that we’ll
probably have to get clearance from DOT and then we can proceed.
DOUGAN: I will be bringing resolutions;
Doreen will be bringing resolutions from her committee to award them and to
accept the funding.
STANLEY, ANDREW: Frontier Town; we’re
still waiting concurrence from Restore NY on that engineer’s recommendation. The
last I talked to Anna last week, I don’t believe we heard anything from them.
STANLEY, MATT: That’s on the chapel
building, correct?
STANLEY, ANDREW: Yeah, the overall
recommendation, which our main concern was the chapel building.
MASCARENAS: That’s Empire State
Development, right?
DOUGAN: We do have said plans, already
for the other work. They aren’t, they’re like 60% set of plans. They’ve moved
forward with everything else so that once we get concurrence, we’ll try and
finalize that and go to construction, you know go to bid at least.
MASCARENAS: Andrew, if you get me the
dates you sent things, I will reach out to Steve, and he’ll get it, he will get
us an answer.
STANLEY, ANDREW: Okay, from what I heard
from Anna, it’s kind of like Groundhogs Day with them, you ask them a question,
and they just have the same answer.
Real property; the painting has been completed;
D&D Floor Covering is scheduled to come on the 24th of this
month to put the carpet in.
DOUGAN: So, that’s the big room upstairs
for Real Property, and so the two employees that are up there are going to move
downstairs temporarily, where Purchasing once was so that we can move all the
furniture around, demo the carpet and but the new sub down. So, they will
probably be down here for about a week, maybe 10 days and then we’ll move them
back up and then we’ll be doing the same thing with the County Attorney’s
office. That carpet has also been ordered, that one does have us building a few
walls.
STANLEY, MATT: Is there any asbestos in
there?
DOUGAN: Not in those areas.
STANLEY, ANDREW: That schedule is a
little tighter, we’re not going to schedule contact until we know that D&D
is ready to go, just so once their work is complete, D&D can come in,
finish that area right up. We don’t want to wait on that one, as far as no
carpet in that area. D&D has been awarded, so the carpet should be on
order, but that has been taking 4-6 weeks, at least.
Public Health Clinic Room; I believe
we’re ready to go other than I don’t have materials yet from D&D, so once
those materials are received then we can schedule that area to get LVT.
DOUGAN: Yeah, Buildings and Grounds is
doing all the painting and drywall repairs. It’s mostly what it is, but that
room is where the vaccines were housed and so Public Health removed stuff a
couple of weeks ago and moved it up to their secondary location at the Public
Safety Building as a training session, moved it up and starting Monday or next
week, we’re going to go in, Buildings and Grounds, are going to do all the
drywall repairs and painting, the flooring removal, so it’s ready as soon as
your materials come in from the contractor.
STANLEY, ANDREW: Yeah, we also have the
two bathrooms in the old section. We’ve have LOA for Con Tech to remodel those.
I believe that was all through a grant that Public Health received.
DOUGAN: Yup, Linda Beers got a $147,000
grant from these things, so we’ve got three different bathrooms that are
getting remodeled and updated and we’re also doing some HVAC improvements for
controls for her and replacing the front stairs with the $147,000 that she got
through a grant.
TYLER: Was it a 100% grant?
DOUGAN: Yup, 100% grant.
STANLEY, ANDREW: And the last one I have
is, if you see these pictures here, is the new Purchasing area, which is where
Personnel formally was. The area was all touched up, carpet was installed
2-weeks ago, and the employees have been moved into that area.
DOUGAN: We utilized some student
trainees who helped us get, do a lot of the painting and they put the pine on
the walls and so a lot of that work was, other than the contracted work for the
flooring, a lot of that work was actually done by those trainees and a little
bit of muscle from Mike and from Dan moving stuff around.
MASCARENAS: All of us, right. Jim came
in on the weekend and did the shelving, what was that Sunday?
DOUGAN: It was a Sunday.
MASCARENAS: But it got done.
DOUGAN: You guys put up with me once a
week, can you imagine my wife? The more I am away from the house, the happier
she is. Actually, she came and helped me.
STANLEY, ANDREW: That is all I had.
DOUGAN: Yeah, I think that’s all we’ve
got. I can tell you the specs are almost done for that, major rooftop equipment
at the Public Safety Building. And Hugh and Jed went and visited a couple
places to see the kind of equipment that we were specifying and non-proprietary
controls, aluminum exterior housing, so hopefully we will have the ability to
just change components in the future instead of full rooftop units with what
they’re trying to do.
CLARK: Have we ever found anybody that
can load test the generator up at the Public Safety Building?
DOUGAN: Yes
CLARK: We did?
DOUGAN: We did. We load tested that
about a year ago. We should be testing it more, you know Clayton talked about
us trying to work through Federal surplus to see if we can actually get one,
get a unit. Haven’t done that yet, but a lot of our generators need that load
testing every year, because of what they’re supporting. This building not so
much, it’s not required but as you get to our emergency communications system
you need more of that.
MENSER: Some information, I contacted a retired
colonel about, if it has military surplus and it’s going to a municipality,
such as a county it would be free.
DOUGAN: Yeah, we’ve done some of that in
the past. I don’t know if I have people qualified to operate it, that’s why I
haven’t pulled the trigger at even looking into it.
MENSER: The training for it takes about
a week. The one that I had gone through 50 years ago.
REUSSER: Would we not be held to similar
standards as residential where there would need to be monthly testing for
insurance purposes?
DOUGAN: All of our stuff, like these
generators out here, they come on automatically and so that’s mostly just
firing the generator, that’s not a switch over. Quarterly or twice a year, I
got to double check, our guys will do a swap on these buildings to make sure
that not only is the generator coming on, but it’s actually creating power
properly and transferring it. It’s great if it comes on, but if it doesn’t
create power, it doesn’t do much for you.
MENSER: It’s a whole different story
between, it starting up and running and whether it can contain a load.
MASCARENAS: Right.
DOUGAN: We’re looking at some more phase
protection equipment to go, like in the courthouse. We’ve lost a couple of
compressors and units lately, that it seems to be, because the power coming
into us has lost a single leg at times and so we’re trying to put more
conditioning equipment in, however we don’t want it to be too touchy that it
turns stuff off. We want it to protect the equipment, but it might be okay if
it goes a generator, just not sure if we will be running the generator all the
time.
THURSTON: Are we done talking about
generators, because I don’t want to interrupt? So, I just wanted to ask about
the Old Cornell Building that we talked about using for records, what’s going
on with that?
DOUGAN: I am carrying in the budget a
roof replacement. We did get drawings for both adding ventilation, insulation
and replacing the roof. So, I’m carrying that in our budget request due
tomorrow, and I haven’t gone any further in the inside, otherwise. Trying to
salvage it from damage, first.
MASCARENAS: Yeah, so a better answer to
that a little bit, your suggestion is what our plan is.
THURSTON: Okay
MASCARENAS: In terms of utilizing that
structure of records long term. The Fish Hatchery closure is kind of part of
that plan. Right now, we met with Ag Society last week, Chris and Ike and Mr. Stanley
came as well. So, there’s some things going on there with how we might change
how work’s done over there. There’s nothing concrete; we’re still kind of
negotiating that contract, which will kind of determine on what we put over
there in terms of help. Our guy that was over there just retired. So, we’re
looking to fill that spot to be quite honest, from May to about this time of
year, about all you can do over there is mow the lawn and weed whack. It’s such
a large area by the time you get done with that you start over, but we may have
that kind of worked out, but still not certain. Would you say that’s the case?
TYLER: Yeah, I just want to throw out
there, and I am remiss in bringing it up, I’ve had a group in Westport approach
me about possibly using a part of that building for a visitor’s center,
heritage house. We lost ours in Westport and my Town Hall is getting packed
with historical stuff and just curious if the County would be interested in
renting a section of that off for that? So, I am just throwing it out there.
MASCARENAS: Yeah, I don’t know their
specific request in terms of space, what they need?
TYLER: No, they don’t. They just asked
if it could be available.
MASCARENAS: Yeah, because right now the
Fair’s using that outer, the front section for the Fair Office. The other
section is where we kind of planned on doing the records, so we could get out
of doing rentals ourselves and have some control over that long term. But we
can absolutely hear what their space needs are, I think that’s fine. But
there’s more to come on the fair and the final plan on how we’re going to staff
that and appropriately address the long term maintenance.
CLARK: Well, the priority of that is and
Jim has already got it going on, is we can’t do anything there until we get a
roof on it. Apparently, you found out, what a week ago, there’s leakage.
DOUGAN: Yeah, there’s a leak and we did
go look at it. It’s coming out of that dormer that we expected. So, the guys
were doing some temporary repairs the other day, but I’ve got the lift over
there and get on the roof.
REUSSER: I was away when the Fair went
on, but the positive chatter about the quality of it this year was very nice to
come back and listen to.
MASCARENAS: Great
STANLEY, MATT: Jim, with the old
building, did we, I know one of the questions about record retention there is
about the structural load of that floor of being able to carry records
upstairs, did that get answered? Or is it something that we need to investigate
once the roof is done?
DOUGAN: I think we still got to
investigate that. There is some pretty heavy steel beams that nobody’s
analyzed. The same thing with down below, there’s a lot of interior piers that
are supporting the floor system. So, we’ve got to do actual analysis on it to
know exactly how many we can put in there that has not been done yet to know
how many records we can fill that space with.
THURSTON: I want to also throw out that
there are some pretty substantial records management grants. So, once the
building is up to par, we could possibly look at applying for a record
management grant for, obviously not all of it.
WOOD: There is a waiting period, getting
the actual work undertaken.
THURSTON: But it’s worth, I think,
applying for.
WOOD: Yeah
STANLEY, MATT: And it’s quite amazing
how much work you guys can do when you’re not building a building. Seeing all
the projects that you went through today. It’s pretty impressive work you guys
can get done. So, hats off to Jim, and your team.
DOUGAN: Thank you for giving people like
Andrew and Hugh and those guys, because that’s really who carries much of this,
I am just a figure head in front of you guys.
WOOD: At the risk of showing how I don’t
retain information so much anymore. Whatever happened with the stage? We were
talking and talking and then either it came and it’s done or?
MASCARENAS: People have been using it
for a very long time. The Fair just used it for the week. It was in North Elba
two weeks ago. It was in Moriah over the weekend for Labor Day. Do you have
anything for a fall schedule?
DOUGAN: No, the last event was Matt’s
for Labor Day and then there was one other one earlier in the year and I forget
what that was.
REUSSER: Would that be available to
outside folks?
MASCARENAS: No
REUSSER: If I wanted it for an event
here in Elizabethtown?
MASCARENAS: If you tell me, you want it
for an event and you’re dealing with it, absolutely. But to deal with outside
agencies and/or personal is a whole different ball game when you’re getting
into insurance and that kind of stuff.
DOUGAN: The Best Fourth in the North was
the other one.
MASCARENAS: Yup, the Best Fourth in the
North was one.
MENSER; How big a stage?
MASCARENAS: It’s big, it’s nice, it’s
professional, I don’t know…
DOUGAN: Around 20’ long, and once it
opens up, it’s getting real close to square.
CLARK: Yeah, really close to square.
MASCARENAS: Yeah, it’s nice, it’s a
professional style stand, you can set speakers on it.
CLARK: The first it was used, it was in
Minerva, wasn’t it?
MASCARENAS: Yup, we’ll deliver it, we’ll
pick it up. There’s a small fee for municipalities to do that.
MENSER: Because Crown Point bought one,
it’s probably 20x16 or 24x16.
MASCARENAS: Yup, I’ll show you. It’s got
a roof structure.
REUSSER: It’s really nice.
MASCARENAS: It’s very nice and we’re
just hoping that it will last. We’ll see the maintenance schedule and how that
works, but it’s a nice tool for communities.
CLARK: Well, with trained people it will
last. If you get anybody that doesn’t know what they’re doing it will be a
pain.
MASCARENAS: That’s always the risk,
that’s why I want to deal with municipalities.
DOUGAN: The people we trained, one
retired and the other one is leaving. So, we trained 4 and 2 are gone.
CLARK: I watched the very setup over
there in Minerva; it was pretty impressive.
DOUGAN: Yeah, the company does good job
with the training.
CLARK: Oh, yeah
DOUGAN: But they’re subject to wind. So,
we have to inspect it every day. We have to inspect it. If it’s a weekend event,
I’ve got to bring people in Saturday and Sunday just to inspect it, just to
take it back down on Monday.
MASCARENAS: Make sure it’s level, all
those things.
MENSER: We strap ours down.
CLARK: We have anything else?
DOUGAN: No, I think we were quick. There
are a number of other projects that are moving right now that are still
ongoing. There’s a lot of moving parts and we’re starting to put together quite
a few requests from other departments for budget and so we’ll bring some of
those and we’ve got a couple of things that we’ll bring near budget time that
maybe alternates to projects. This is, what we did downstairs and moving people
next door provided us with swing space which means I can move some people out
of a department to do the requested renovations. The disruption is what makes
it really tough sometimes.
CLARK: That first area going into yours,
that suggested that you have that being our little conference room would be
nice. It’s big.
MASCARENAS: Yeah
CLARK: It would be in the future.
MASCARENAS: I am thinking long term to
have those conversations and utilize it for a training room and we lack that
here, pretty significantly. This room is even difficult at times, to even hold
a budget or a meeting like this isn’t easy.
DOUGAN: And that spot back right there
backs up to the other hallway.
CLARK: We can knock that out there.
DOUGAN: There’s a lot we can do.
REUSSER: It used to be an exterior wall,
right?
MASCARENAS: Used to be a hall.
DOUGAN: This right here was an exterior
wall, but that was a hallway to Social Services and that other bathroom.
CLARK: Goes right out that front door.
MASCARENAS: The entrance with the ramp
is other there, too. It’s really the only handicapped ramp coming on the front
of the building, which you can’t really get anywhere once you get in that
hallway.
CLARK: Well, if we have nothing else,
why don’t we adjourn. Thank you.
AS
THERE WAS NO FURTHER BUSINESS TO COME BEFORE THIS BUILDING AND FACILITIES TASK
FORCE, IT WAS ADJOURNED AT 9:58 AM
Respectively Submitted,
Dina Garvey, Deputy Clerk