DPW - COMMITTEE
Monday, May 18, 2026 -
9:30 AM
Clayton
Barber, Chairperson
Chris
Clark, Vice-Chairperson
Chairman Barber called this DPW Meeting to
order at 9:30 am with the following Supervisors in attendance: Clayton Barber,
Matthew Brassard, Chris Clark, Mary Lamphear, Steve McNally, Clayton Menser,
Timothy Pierce, Richard Preston, Cathleen Reusser, Matt Stanley, Davina Thurston,
Ike Tyler, Joe Pete Wilson and Margaret Wood. Timothy Follos, Ken Hughes, Tracie McGill and
James O’Bryan were excused.
Department Heads present: Doreen Abrahamsen, Judy
Garrison, Michael Mascarenas, Roy Holzer and Jim Dougan.
Also present:
Alice Halloran, Buildings & Grounds staff – Josh Meachem, Alan Arno,
Joel Morris, Chris Gregory, Owen Nephew, Jaime Crandall and Cameron White.
BARBER:
I will call this DPW meeting to order.
Please stand for the pledge. Mr.
Dougan. Good morning. Where would you
like to start sir?
DOUGAN:
Well I a little shorter agenda. I only have three resolutions which I
know you guys are used to seeing more than that from me but I’ll try to make up
for it next month.
MASCARENAS: I’m fine.
DOUGAN: You’re fine with that? Those of you that attending the buildings
facilities committee meeting over the last few months you heard us talk a lot
about work that we’ve been able to do in house with buildings and grounds staff
so I asked our guys that are located right here to stop by so this board could
see who those people are, put a name to a face.
They’ve been working hard on the building next door probation. We are almost complete. Furniture is supposed
to be delivered next week if you guys want to wander through in between
meetings and take a look at what they’ve done. They’ve done most of the work.
We did use a contractor to finish the dry wall. We did hire a contractor to put
the carpet down and to install the ceiling grid but all the rest of the work
that’s done there especially if you go upstairs and look at the condition that it’s
in right now and compare it to the space that we’ve just got done it’s done by
these guys right here so I’m just going to ask them to each stand up or tip
their hat so you know their name is all so, Josh Meachem, Chris Gregory, Owen
Nephew, Al Arno, Jaime Crandall, Joel Morris and Cameron White. So along with managing all the maintenance
calls we get on 358,000 square feet of space, one hundred fourteen of it is up
at the public safety building and at some point I hope you guys meet a few
individuals we have up there but these guys are doing some good work while
juggling maintenance and lawn mowing and snow plowing and toilet overflows all
those other things so I just wanted you to have a chance to meet them that’s
all.
REUSSER: I’m not on this committee but I would
like to say, that I worked with several of these guys and a lot of them since
they were quite young guys and the growth that I’ve seen and the things that
they do for their careers is amazing and where they are and what they are
teaching the younger crew. They are such a great value to Essex County and
proud to work with several of them.
STANLEY:
I would just like to say, just as buildings are assets to the county our
staff is an asset to the county as well and without you guys doing the work you
do we would not be able to keep our buildings and the cost to maintain those
buildings down so it’s notable for those reasons I know myself and I know this
board, we appreciate what you guys do and thank you very much for everything
that goes on.
BARBER:
So, being the head of this department I’d like to pass a resolution of
appreciation for the whole department on behalf of this board. Unanimous second, thank you.
RESOLUTION OF APPRECIATION TO THE ESSEX COUNTY
BUILDINGS AND GROUNDS STAFF. Barber,
unanimous
DOUGAN: Thank you.
BARBER: Thank you guys. Very much appreciated.
DOUGAN:
These guys are all coming along well.
They are really trying to do projects instead of just me so thank you.
If we can go right to resolutions – I have
three written here and I may have one more. The first one is requesting a
contract amendment with SRA Engineers. It’s in the amount of $7,660.00. That is
for a geomorphic evaluation for the Fisk Road over McKenzie Brook culvert
replacement project. US Fish &
Wildlife is funding the design of two projects for us, funding it completely
but when you work with an organization like there are certain extra steps they
want you to do so geomorphic evaluation is geo – earth, morphic is change right
so it’s the study of how that particular stream changes the earth around it so
we’re going to be – it’s fairly extensive document when they are all done but
it’s to make sure overall that’s a resilient structure and that structure that
we put in also it allows sediment to move down through that area like it
naturally would if there wasn’t a structure there and it’s also looking to make
sure that structure isn’t causing a change in the earth that therefore causes
harm to the fish and the wildlife that are in there. It’s all coming from US Fish and Wildlife
funds.
RESOLUTION AUTHORIZING THE COUNTY CHAIRMAN OR
COUNTY MANAGER TO EXECUTE A CONTRACT AMENDMENT WITH SRA ENGINEERS IN AN AMOUNT
NOT TO EXCEED $7,660.00, TO PROVIDE PROFESSIONAL ENGINEERING SERVICES INCLUDING
GEOMORPHIC EVALUATION FOR THE FISK ROAD OVER MCKENZIE BROOK CULVERT REPLACMENT
PROJECT LOCATED IN THE TOWN OF MORIAH, WITH FUNDS TO COME FROM US FISH &
WILDLIFE FUNDS. Clark, Menser
BARBER: Any questions, concerns?
THURSTON: I’m not on this committee but I have
question, is this, the evaluation do we have a contractor for that? Is there a bid or does it go through –
DOUGAN: This is our civil term engineer, one of
our two on contract engineers they will be doing this per the hourly rates that
are already in the contract.
THURSTON: So towns can piggyback?
DOUGAN: Absolutely.
THURSTON: Thank you.
MENSER: Crown Point is.
DOUGAN: Yes, Crown Point is right now.
BARBER: And you are on this committee.
THURSTON: Am I?
I apologize.
BARBER: Is there any other questions. All in
favor, opposed – carries.
DOUGAN: The second one is the same thing other
than it’s for Adrians Acres over Slide Brook in the Town of Keene and it’s for
just a little less money, $7,580 and in all honesty, that’s due to over Slide
Brook a little more rock in the stream verses Fisk which is a little more
sediment soils can move but same otherwise.
RESOLUTION AUTHORIZING THE COUNTY CHAIRMAN OR
COUNTY MANAGER TO EXECUTE A CONTRACT AMENDMENT WITH SRA ENGINEERS IN AN AMOUNT
NOT TO EXCEED $7,580.00, TO PROVIDE PROFESSIONAL ENGINEERING SERVICES INCLUDING
GEOMORPHIC EVALUATION FOR THE ADRIANS ACRES OVER SLIDE BROOK CULVERT REPLACMENT
PROJECT LOCATED IN THE TOWN OF KEENE, WITH FUNDS TO COME FROM US FISH &
WILDLIFE FUNDS. Pierce, Thurston
BARBER:
Any questions, concerns? All in
favor, opposed – carried.
DOUGAN: Number three would be a contract
amendment, it’s in an amount not to exceed $167,703.75. It would be to All States Construction.
That’s for the removal of the Forge Lane Bridge, the superstructure down here
just getting out of town in Elizabethtown with funds to come from budgeted
funds.
RESOLUTION AUTHORIZING THE COUNTY CHAIRMAN OR
COUNTY MANAGER TO EXECUTE A CONTRACT AMENDMENT WITH ALL STATES CONSTRUCTION,
INC., IN AN AMOUNT NOT TO EXCEED $167,703.75, FOR THE FORGE LAND OVER THE
BOQUET RIVER BRIDGE SUPERSTRUCTURE REMOVAL PROJECT, LOCATED IN THE TOWN OF
ELIZABETHTOWN WITH FUNDS TO COME FROM BUDGETED FUNDS. Clark, Wood
BARBER:
Any questions, concerns? All in
favor, opposed – carried.
DOUGAN:
I do have one more. I’d like to apply for a grant. It’s called the Build
Grant. It’s a Federally funded grant. I’d like to apply to that to study the Ensign
Pond issues, all the flooding that we’ve had there recently. It’s a competitive grant application. I’m
sure what our success is going to be but we obviously have a lot of photos, a
lot of issues over the last really decade that I can turn in to show why this
issue there that flooding we believe is bigger than just what’s in our road
right a way so I’d like a resolution to apply for that Build Grant.
RESOLUTION AUTHORIZING THE DEPARTMENT OF PUBLIC
WORKS TO APPLY FOR A FEDERALLY FUNDED BUILD GRANT TO CONDUCT STUDIES ON THE
ENSIGN POND ROAD FLOODING ISSUES.
Stanley, Wood
BARBER: Questions,
concerns?
THURSTON:
A couple of questions on that. Do we know what the match is?
DOUGAN: It’s 100%.
THURSTON: Hundred percent?
DOUGAN: It’s 100% for the study portion.
THURSTON: Okay and do you need engineering
completed in order to apply for the grant?
DOUGAN: No, we’ve done most of that in-house
already along with our other but we will have to use an engineer firm
consultant from New York State DOT’s LDSA list that’s the fifteen engineers
that they have on contract. We will have to use one of those engineer firms if
we get awarded.
THURSTON: If you get awarded so there’s no
upfront engineer costs?
DOUGAN:
No
THURSTON: Thank you.
BARBER: Is there any other questions,
concerns? So you’ll have this drafted up
for our regular meeting?
DOUGAN: No, I’m going to go ahead and apply for
the grant to bring the resolution along but it’s looking like it’s going to be
in the amount, the study is going to be approximately $430,000, a lot of that
is survey work because again, at Ensign Pond Road we think the issue is the
water and sediment that is coming at Ensign Pond Road from all those years
owned by the state so there’s a lot of work in surveying and we’re going to
prove that point.
MASCARENAS:
Yeah and the way grant resolutions work it’s really just to apply. So you get a second crack at it if we’re
fortunate enough to get the award technically we don’t have to ask to apply
because there’s no changes to the budget. We like to so that you’re informed
the entire process and it won’t be the first time you’ve heard it so you’ll get
another crack at it in terms of a budget amendment if we’re fortunate enough to
be awarded.
BARBER:
All in favor, opposed – carried.
DOUGAN: That’s all I had for resolution
requests. I did give you a little bit of information on our gasoline, diesel
and asphalt prices so realistically if asphalt stays where it is right now I’m
projected that the amount of tons of asphalt we plan to buy are going to cost
me an additional half a million dollars this year as to compared to what they
were when I first did this in March. Right now it looks like we’re, if diesel
and gasoline prices stay where they are it looks like I would probably – based
on normal usage I’ll probably spend over $50,000 than I have in my budget right
now. We’re coming up with contingency plans in house but we don’t need to punt
yet but I wanted everyone to know that we’re watching it. That’s all. Other than that we start paving.
BARBER: Jim, over the weekend has the Governor
announced what towns are getting for CHIPS money yet?
DOUGAN: Did they pass the budget? I haven’t
been following it.
MASCARENAS: I haven’t seen it.
BARBER: I heard they had and then she asked for
an extension?
DOUGAN: Until they pass the budget you won’t
get your CHIPS letter until they do so.
MASCARENAS: The closest thing I got is they
have a deal but nobody knows what that is and the specifics of that deal are
what matter to an awful lot of us, right so until they have a vote and it moves
forward we’re not going to know the specifics.
BARBER: Okay and then this morning I received a
phone call from a Steve Mackay. Do you
know him?
DOUGAN: Yup.
BARBER: So, he said to me, I heard you are a
head of the DPW and I talked to Mr. Menser this morning a little bit about it
coming in Crown Point –
DOUGAN: He owns the property on Bradford Hill
Road where we had FEMA work up there.
BARBER: Okay and he elaborated to me he signed
an agreement with you to do some work coming down –
DOUGAN: To give us access to the property from
the FEMA damage that occurred yup.
BARBER: Okay so there was FEMA damage there?
MASCARENAS: Easement is what you’re talking
about.
BARBER: Yeah.
He still has some concerns on coming down there with flash floods coming
down that roadway.
DOUGAN: We’re working with FEMA to try to get
FEMA to fund us planting trees down that whole hillside, okay?
BARBER: Yup he mentioned that, the planting of
trees.
DOUGAN: FEMA has said no so far unfortunately
the bank that gave way is above the road, had the bank been below the road and
a structural component FEMA would of automatically let us go further. FEMA
isn’t automatically letting us go further so we’re still appealing that. The
other thing that we’re doing is with the Fish Hatchery closing, there was a
structure in the middle of the fish hatchery, a bridge that’s no longer needed
so we’re looking to take that approved FEMA project and turn that in to what is
called an alternate project that will pay for those trees that we’re asking for
because they are all within the same watershed they are all immediately above
Putnam Creek.
BARBER: Okay so I can just let him know that
you’re following up?
DOUGAN: Yeah, I can write that all out if you
want and get something for him and out to him.
MENSER: What Mr. Barber stated to me earlier
Mackay was complaining about stuff coming down the White Church Road and
possibly Breed Hill not Bradford Hill.
BARBER: He did say it was right after a White
Church coming down the hill, coming into Crown Point so again, I’m unfamiliar. It would have to be his right of way because
he did mention that he signed an agreement.
MENSER:
Okay that would be on Bradford Hill.
DOUGAN: Yes.
MENSER: And that one I’m definitely aware of
for a lot of reasons.
BARBER: Okay.
DOUGAN:
For the board’s benefit we did go to FEMA for this project, there was
some work that the homeowner did, the property owner did prior to the event. He
clear cut the property and he removed all the stumps on a very steep slope.
What was the cause of the damage? Was it the storm or was it the work that was
done before? Okay, so I feel we played
pretty nicely to go once there was damage from the storm to go back and fix it.
There possibly could have been other things that I would have recommended to
this board what to do in such a situation but I chose to play nice. Doesn’t sound like me does it Mike?
MASCARENAS: No.
MENSER: I’ve been amazed that the county did as
much as they have.
MASCARENAS: You and me both.
BARBER: So is there a chance that it could be –
if you don’t get the funding to plant trees is there a chance because and I’m
just elaborating what he asked if maybe it could be hydroseeded?
DOUGAN:
We’ve done hydroseeding a number of times there.
BARBER: And it just washes?
DOUGAN: The best thing, there’s a lot of
erosion control of materials on that hill right now as we’re trying to have it
reestablished. We’re trying to go the FEMA route to get the trees. We got an
estimate of about $200,000 worth of trees there if we can get FEMA to approve
it. I have not yet asked Alice for help but I may ask Alice for help in the
future if FEMA isn’t successful.
BARBER: Okay thank you.
MENSER: The problem with this there is no top
soil left there just sand.
BARBER: Yeah from what he elaborated I kind of
got that sense too that it was definitely because that was his concern with the
heavy rains, when we get the heavy rains that the water really rushes down
through there.
REUSSER:
With the work that was done have you inquired a DEC permit? You don’t need to answer that I’m just
throwing that out there. I will mention
Colin Powers, BRASS Executive Director was able to apply for a grant to help me
with planting on Roaring Brook.
DOUGAN: We want the establishment of trees
there too. It’s a steep slope above a
county road okay, it’s always going to be an issue. How the issue started but it’s always going
to be an issue so we want that too and we really didn’t want to put in a giant
wall to hold back that slope that was another potential option that would have
been another asset that we have to maintain so our goal is to get trees, trying
to go down the FEMA path right now if we can.
REUSSER: Well, they are back to work.
DOUGAN: Exactly and we were waiting for that
for quite some time after the fish hatchery was closed was the first time we
could go to an alternate project. They’ve been shut down for most of the time
since that resolution was done so we are working on it.
BARBER: Okay thank you. Anybody have any other questions for Jim?
Thank you. Alice, Soil and Water.
HALLORAN:
Good morning. So we moved. That’s
exciting. We are happy to be in the new building. Still settling in polishing
things up but feel free to stop by anytime and check it out. We’re planning an open house with Cornell
Cooperative Extension for June 25, you’ll hear about it once we iron out all
the details.
The north Adirondack regional Envirothon was
held and the Soil Sisters from Minerva Central School won this year and they
are going to head to the state competition in Cortland next week. We are having our environmental field days
that’s for I think fifth and sixth graders June 2 at the fairgrounds. We have
one farm project going on and closing out a bunch of our farm grants from last
year and waiting for the next CFA round to come out. Any questions?
MENSER: We are working with Jim Dougan on a
FEMA project for the landfill on Middle Road in Crown Point and it’s going to
require re-sloping in the area and we are going to need to have that seeded and
whatever trees and stuff so we’re hoping we could get support from you guys to
come down with your hydroseeder and take care of that.
HALLORAN: Definitely. Is that the place that had the failure a few
years ago?
MENSER: Yes.
HALLORAN: Okay and do you know the timeline of
when you think you’re going to be needing it?
MENSER:
I don’t know because they are just getting ready to go out to bid. I
just arranged for the easement on the neighboring piece of property over the
weekend.
HALLORAN: Okay, yeah I’m sure we can help.
MENSER: Thank you.
BARBER: Any other questions for Alice? Alice, I’ve got one tire collection. Are you
doing tire collection?
HALLORAN: We haven’t planned one yet but we’re
hoping to plan one soon.
BARBER: Well, I’m hoping you can do one in Chesterfield. I’ve
had quite a few constituents ask if there was going to be one.
HALLORAN: Okay.
REUSSER: I’m getting a lot of questions from
people interested as well.
HALLORAN: Alright we’ll try to set a couple up
and let you know the when’s and where’s.
BARBER: Okay.
STANLEY:
I guess since we’re talking about tires I want to thank you for
scheduled one for our Amnesty Day over the weekend it was extremely successful
and Renee was great to just say, hey we need to stay until we’re done. Thank
you.
BARBER: Okay is there any other questions?
MASCARENAS: Alice, when the details of the open
house are scheduled can you communicate that with Judy please just because I
would like to make sure that some of the old board members that are no longer
with us get invitations. They were the ones that kind of got it rolling, new
board got it done but old board kind of did the ground breaking and those things
and I would like them to get an invitation too.
HALLORAN: When I send an email to the
supervisors email list, is Judy on it?
MASCARENAS: Yes, she is. That will work.
GARRISON: Thank you.
BARBER: Good thank you.
HALLORAN: Alright, thank you.
BARBER: Doreen, Transportation.
ABRAHAMSEN:
Not much in the way of new news this time just basically my monthly
report with my stats. MAS trips have
gone up somewhat they usually do this time of year then they drop down because
everybody is going on vacation. Still definitely looking for bus drivers. My part timers are starting to age out and
I’ve got just about a continuous posting out there for part time bus drivers so
that’s always a need.
MENSER: I had spoken to one of the Judges in
the county and they were asking about what we could do to make sure that the
bus that transports people could start going to the probation office now that
it is no longer here it’s a much bigger hike.
ABRAHAMSEN:
I’ve had several conversations with Probation and the Sheriff’s
department and social services regarding these things. We do now do a deviation
so I have my driver come in a little early before the shift because we start at
DPW and for anybody that needs to come from probation or jail we go out there
whatever shift is closest to when they need to be picked up and we bring them
to wherever they need to go usually they need to connect to another bus and the
same, I encourage when they release somebody we do the same. All it takes is a call to set it up. I can’t
just add the safety building to my schedule because it offends a lot it’s not
just a quick stop like we’ve done for the Amish up in Willsboro we just went
around another road you know, those little things are okay but there’s not
enough steady riders. If they were to come up with a plan where all probation
meetings were going to be at a certain time or if they have court they were
going to be on a certain day even I could work with that a little bit more but
at this time we do everything we can to cover their need as far as if we get a
phone call from either the person that needs the ride or if they have a case
worker, probation calls me a lot, the sheriff’s department has called me. We
are willing to bring drivers in or have stay late to do that deviation.
MASCARENAS:
Just so everybody knows after the meeting last week Mr. Hughes and I
followed up with our probation director.
You know a lot of times things on the floor get said and we don’t really
understand it might be an isolated incident and we think it’s a huge problem or
we need to define the problem and exactly how many people is this impacting
what’s happening, how do we meet people? Bottom line is we meet a lot of people
in the field. We are one of the few probation departments that still do that due
to our geographic location. Now there
are other things that don’t allow us to meet in the field which are typically
placed on the individual whose on probation that you need them in a secure area
they might be a little more dangerous of an individual that requires them to
come here specifically so you’ve got to understand there’s a lot of things in
play and what I can tell you is it’s not consistent so, what we really need to
figure out is a way that’s cost effective if Doreen were to change her schedule
daily to account for that issue there would be many days she would have nobody
on that ride. The majority of the days there would be nobody on that ride so we
got to really figure out the problem and the best way to solve it and what I
can tell you is consistently inconsistent in terms of the need for that trip.
The same problem existed quite frankly when probation was here the difference
was there’s a pickup at 8 and 4 but often there was a lot of hanging around
until that bus left at 4 every day whether they had a 10 o’clock appointment or
9 o’clock appointment that’s just kind of how it was so we are talking about
it. Heather is gathering us better data
on her end to let us know just how much of a problem this is and I think then
we can come up with better solutions. There’s a lot of different ways to attack
that kind of thing from having a small satellite here where you have one office
but again, is that going to account for people that want to pop in, have to
meet deadlines those types of things that’s very different so, we’ve got to
figure out what the problem is or define the problem better before we ask
Doreen to change everything she’s doing to accommodate a small handful of
individuals.
TYLER: I’m not on this committee but I’m just
guessing, it’s like with everything else that’s going on with society nowadays
people you know they commit a crime, they do things and they are always blaming
other people for their problems and we’ve got a few people that can’t make it
to probation because they can’t get a ride there you know, okay well, anyway I
just wanted to make that comment.
BARBER: I agree with you.
MENSER: What I think would really help is that
if we had really good communications between probation and transportation and
that probation actually set up a schedule for people coming from other towns
that don’t have transportation and say look, this is when your probation
meeting is going to be and the bus is going to be available on those days only
so there will be no excuse for you not being on that bus.
MASCARENAS: Yeah and like I said there’s a
large amount of individuals that if they have a DSS case, DSS will figure it
out and get them there because so many of our individuals that may be involved
in probation believe it or not are also involved in other services we provide
and we can take advantage of some of those transportation opportunities so it’s
really all over the board whether it’s mental health, whether it’s DSS right
those agencies do a fair amount of transportation for us ACAP sometimes has
their volunteers that are available so it’s a little bit all over the map in
terms of how it’s happening and there are people that fall through the cracks
and those are the ones that we’ve got to identify and figure out how to provide
a better level of service for those individuals but ultimately it’s those
individuals that Mr. Tyler is eluding to it’s their responsibility to get
themselves there. I mean, it really is.
MENSER:
If we are telling them that we are going to provide the transportation
this is going to be your appointment and you’re not there for it you’re going
back to jail and I have no problem doing that.
ABRAHAMSEN: We’ve had these conversations like
this and ultimately a lot of times like you’re saying we have set up deviations
and they don’t show.
MENSER: Yeah that’s when you send them back to
jail. You don’t have to do the
deviation.
BARBER:
Although then you’ve got to get your Judges to do that.
PIERCE: That would be court issued.
MASCARENAS: That’s the issue.
BARBER: I know it’s a big issue in the Town of
Chesterfield.
STANLEY:
So I brought this up when transportation was an issue before with our
lawyers. Is it possible or does the
meeting need to be in person or can they video conference in our town halls to
the probation department like just a way to sort of, I feel like we’re
constantly trying to figure out how we can get somebody somewhere and one of
the biggest geographically size counties in the state. I mean technology is
there is that a way we can save money?
MASCARENAS: Yeah I think we always have to look
at that. I don’t think you’re wrong. I
think depending on the probationary and what the expectation of the court is
would determine what is an appropriate meeting. So many of these individuals
may have to get drug tested, weekly or monthly or that kind of thing we do know
that that’s our biggest issue in Essex County for those individuals that are on
probation they share that problem so the answer would be no in that
circumstance because the probation officer has to go over with them, they have
to make sure they are at the hospital and they are appropriately being tested
but, I’m sure there’s instances where you absolutely can. Like I said earlier, our probation office is
your court you know this, you’ve seen it. They are coming to try to be very
good about accommodating the public’s need because they recognize our
geographic challenges we have in getting there so we need to identify who is
this population, how many are there and why are they slipping through the
cracks and how can we figure that out.
BARBER: So when that was done at a town level
was the county providing a probation person?
MASCARENAS: Yeah, we still are. Like I said you’ll see them in your courts
and in your town you may not know who they are but they are there. So they are absolutely coming to your towns
on a regular basis with their clientele they typically operate in conjunction
with your courts so a lot of times if your court is open on such and such a
night there’s a probation officer likely in the room that you may not like I
said, recognize.
BARBER: Because I know in the Town of Chesterfield
I used to have a probation officer that used to come in pretty regular and that
no longer happens so are you saying that he’s – if there’s one there he’s
probably there on the court date?
MASCARENAS: Likely but I can get the exact
schedule what probation officers are in what courts, what nights they are there
those types of things.
BARBER: Could you do that?
MASCARENAS: Yes.
BARBER: I’d like to see that too.
BRASSARD:
Not related to court but can you off the top of your head do you know
was our skier shuttles, was that up riders this year? Down? About the same?
ABRAHAMSEN: About the same maybe a little
higher but just about the same.
BRASSARD: That’s all I need.
BARBER: Any other questions? We’re adjourned.
As
there was no further discussion to come before this DPW committee it was
adjourned at 10:05 a.m.
Respectfully submitted,
Judith Garrison, Clerk
Board of Supervisors